Our Projects

Tyee Lake Hydroelectric (IECO)

The investigation included using a mini-sub to map the lake bottom (>100’ deep) to locate a suitable lake-tap entrance, seismic studies for the control dam foundation, geologic mapping of the surface and subsurface (diamond drilling), selection of penstock, powerhouse, tunnel locations and a natural hazard assessment.

Solomon Gulch Hydroelectric Project (IECO)

Drilling of dam abutments for final design, mapping and characterization of penstock corridor, material site identification, and road alignment.

Terror Lake Hydroelectric Project (R.W. Retherford & Assoc.)

Drilling and subsurface evaluation of dam abutments and tunnel alignments, geologic mapping of penstock, road and transmission routes.

“So far the drillers have averaged 100 ft a day which is better than I have experienced on any other projects in this part of the Alaska Range. Your guys have gone to great lengths to maximize recovery in the mineralized structures.” Sam Dashevsky, Northern Associates